In 2015, Antwerp University Hospital was looking for a solution to expand heat production while reducing energy consumption. Luminus Solutions installed a 1.5 MWe CHP plant and optimised the entire sanitary hot water system. The new installation was paid for in less than 3 years and still provides the UZ Antwerpen with savings of approximately 30% on its annual energy bill.